Things tagged 'consultation'

limited to the area of Lambeth Cyclists:

72 issues found for 'consultation':

  • Lambeth Oval and Princes Ward CLIP Consultation

    Created by Charlie Holland // 1 thread

    Council's investment consultation, primarily focused on spending development levy. May offer capacity for training young people to become cycle mechanics, improved walking and cycle routes, cycle parking on estates etc.

    From the Council pack (see link).

    What are your priorities for your streets, open spaces and places?

    The Council’s Local Data Platform brings together a wealth of facts and
    figures about the area, including areas of deprivation and need, and groups
    of residents more likely to be less well-off. We also take into account what
    projects are already planned or underway, together with residents’ views
    on priorities. Using this information, we have identified four priorities for
    investment ideas:
    • Youth opportunities, activities and facilities
    • Support for jobs, training and skills
    • Building stronger communities across the neighbourhood
    • More inclusive places where people live

    This report will be used by the council to inform investment decisions
    over the next three years.

    Please sign in to vote.
  • Prairie Street one way

    Created by Simon Munk // 1 thread

    Wandsworth council says:
    We are consulting on a proposal to introduce a partial one-way on Prairie Street to prevent Heavy Goods Vehicles (HGV) entering the area from Queenstown Road.
    The proposals have been developed in response to complaints received by the Council that HGVs are using Prairie Street as means of access to the London Stone Business Estate. The proposals were put forward to the council’s Community Services Overview and Scrutiny Committee in July 2016. The Council’s Executive has approved the proposal subject to the outcome of a public consultation."

    Please sign in to vote.
  • Junction of A100 Tower Bridge Road and Tanner Street

    Created by Simon Munk // 1 thread

    TfL Overview
    In partnership with the London Borough of Southwark, we have developed proposals to improve the provision for cyclists and other road users around Tower Bridge Road/Tanner Street junction, and we would like to hear your views.

    What are we proposing?
    The proposals are part of the Central London Grid – a network of cycle routes in Zone 1. The route passes along Tanner Street, Southwark Council consulted on proposals on the rest of the route in autumn 2015, including proposals for the one-way operation of Tanner Street. Our proposals aim to improve safety and create more space for cyclists, and have been coordinated with Southwark Council’s designs.
    Our proposals also include changes to traffic and bus lanes, as well as new traffic restrictions and improved pedestrian crossings.

    The enclosed consultation drawing shows the proposals for this junction. The numbered descriptions below correspond with the numbered labels on the drawing.
    1 Carriageway to be widened by 0.5 metres to improve traffic flow. There will still be sufficient width maintained on the footway.
    2 Centre lines to be altered to provide two northbound general traffic lanes further back from the junction with Druid Street
    3 New one-way westbound on Tanner Street between Tower Bridge Road and Archie Street to create space for a segregated two-way cycle track
    4 New one-way eastbound on Tanner Street between Tower Bridge Road and Pope Street to allow for contraflow cycle provision
    5 Segregated bi- directional cycle track to allow cyclists to approach and exit the junction with substantially reduced risk of conflict with motor vehicles
    6 New segregated contraflow cycle track to parallel crossing to allow for safer approach for cyclists, and to decrease potential conflict between modes of traffic. This would require the relocation of a loading bay (see 9 and 10)
    7 New parallel cycle/pedestrian crossing to connect the cycle route on Tanner Street and allow cyclists to conveniently cross Tower Bridge Road separately from pedestrians
    8 Cycle stands to be relocated to allow for widened traffic lanes on the approach to the junction, and to prevent conflict between traffic modes
    9 Loading bay relocated from Tanner Street to Tower Bridge Road to create space for the contraflow cycle track (see 6). The same operating hours will apply
    10 New position of relocated loading bay from Tanner Street (see 9)
    11 Loading bay relocated 12m south to provide enough space for traffic to merge. Operating hours will remain the same.
    12 New bus lane (Hours of operation: Mon –Sat, 7am-10am, 4pm-7pm) to make journeys faster and more reliable for bus passengers. We would create space by moving the centre line on this section of Tower Bridge Road.

    Please sign in to vote.
  • Vauxhall Cross public consultation

    Created by Simon Munk // 2 threads

    TfL say:
    We are proposing a number of transformational changes to Vauxhall Cross as part of our Road Modernisation Plan.
    The Road Modernisation Plan is the biggest investment in London’s roads for a generation, consisting of hundreds of projects to transform junctions, bridges, tunnels and pedestrian areas, making our roads safer and more reliable.
    Working closely with the Lambeth Council, we are aiming to return the one-way road system at Vauxhall to two-way roads and significantly improve pedestrian and cyclist provision to help create a safer and less intimidating environment for vulnerable road users. The proposed changes would also help to improve connectivity throughout the area, and create a better environment for people living, working, and travelling through Vauxhall.
    Following our initial consultation in 2014 on our high level proposals, we are now inviting your views on our detailed design proposals.

    What are we proposing?
    The changes we are proposing include:
    Removing the existing one way road system around the transport interchange (Parry Street, Wandsworth Road, Kennington Lane, South Lambeth Road) by converting these roads around Vauxhall to two way
    Providing more cycle and pedestrian crossings as well as segregated lanes and parking for cyclists
    Improving existing and providing new public spaces
    Redesigning the transport interchange, including a new central bus station

    Why are we proposing this?
    Reducing traffic dominance
    The current gyratory creates an environment heavily dominated by motor vehicles. The wide carriageway encourages high speeds, especially outside peak periods
    The gyratory can be difficult to navigate, and the one-way arrangement means that vehicles often follow indirect routes
    Lack of facilities for pedestrians and cyclists
    Large numbers of pedestrians pass through Vauxhall each day but the existing crossings do not always follow the most direct or popular routes, which can lead to pedestrians crossing roads away from the crossings
    The Vauxhall gyratory has some of the highest numbers of collisions involving injury to pedestrians and cyclists in London
    Cycle Superhighway 5 will improve conditions for cycling along Harleyford Road and Kennington Lane. However, there is limited cycle provision on the other roads surrounding Vauxhall Cross and a lack of connectivity between facilities
    Supporting the transformation of Vauxhall
    Vauxhall is the gateway to one of Europe’s largest regeneration zones, with 25,000 new jobs and 20,000 new homes coming to the Vauxhall, Nine Elms and Battersea area
    Supporting Vauxhall’s distinct local character, the proposals look to the future – preparing for the increase in the numbers of people living, working, and visiting Vauxhall and its existing and new shops, businesses and attractions

    Please sign in to vote.
  • East-West Cycle Superhighway - phase 2 consultation

    Created by Rosie Downes // 11 threads

    TfL are consulting on plans for the East-West cycle superhighway in Hyde Park and St James's Park. The proposals can be seen at https://consultations.tfl.gov.uk/cycling/eastwest?cid=cycle-east-west

    The LCC office has set up this thread to facilitate discussion in advance of submitting its response to the consultation. The consultation closes on 29th March.

    To ensure that your comments will be taken into account when composing LCC’s response please make sure that your registered identity on Cyclescape includes your full name and whether you are a member of LCC and any local LCC group. (You can add these details by clicking on your name at the top of the page and then the Edit Profile tab.)

    Please sign in to vote.
  • Westminster Bridge South

    Created by Simon Munk // 1 thread

    TfL say:

    "The improvements would provide a connection between the East-West Cycle Superhighway on the north bank of the Thames and the Central London Cycling Grid on Belvedere Road and Royal Street in Lambeth, providing a joined-up cycling network for this part of London."

    "Proposed layout changes for cyclists
    Provide cyclists with dedicated road space on Westminster Bridge, Westminster Bridge Road, Lambeth Palace Road, Addington Street and York Road; cyclists would be separated from traffic by a kerb or white line
    Separate cyclists and motor vehicle movements at junctions; cyclists would have their own traffic signals which would operate at different times to those for other traffic
    Widen the pedestrian/cycle crossing by the south end of Belvedere Road and improve the connection between Belvedere Road and Westminster Bridge Road
    Convert the pedestrian crossing on Lambeth Palace Road outside the hospital to a pedestrian/cycle crossing so that cyclists can access Royal Street from Lambeth Palace Road. The crossing would be changed from ‘staggered’ (two separate crossings with an island in the middle) to ‘straight across’ (a single crossing)
    Provide bus stop bypasses at bus stops D and E on Westminster Bridge Road, bus stops B and C on Lambeth Palace Road and the tour bus stop at the east side of Westminster Bridge so that cyclists could avoid having to mix with traffic. Cyclists would continue behind the bus stops on a carriageway-level cycle track, which would feature a chicane and narrowed track to reduce speeds. Bus passengers would access the bus stop waiting area by crossing the cycle track using a marked crossing point/s
    Widen the footway on the corner of York Road and Westminster Bridge Road to slow down left turning vehicles
    Cyclists would still be able to use the northbound bus and cyclist only route from Westminster Bridge Road to York Road"

    "Cycle facilities on Westminster Bridge
    "Westminster Bridge is a grade two listed structure and a busy bus, cycling and pedestrian route. We would like to know what you think about how cycle facilities should be provided on Westminster Bridge. We are proposing two options:
    a. 2.3m wide mandatory cycle lane in both directions
    This approach would give cyclists more space to overtake one another. A painted white line would separate cycles and motor vehicles, but there would be no physical segregation. Motor vehicles would be prohibited from entering the cycle lane.
    b. 1.8m wide segrgated cycle track in both directions
    This approach would provide cyclists with physical separation from motor vehicles using a 0.5m wide traffic island, but may reduce cyclists’ opportunity to overtake one another."

    Please sign in to vote.
  • Buckingham Palace - Spur Road

    Created by Colin Wing // 1 thread

    Spur Road and the road in front of Buckingham Palace form a section of the East-West Cycle Superhighway between Constitution Hill and Birdcage Walk.

    The plans that Transport for London presented to the public for consultation in February-March 2015 failed to include any specific proposals for this section. Following successful campaigning by cyclists, TfL published proposals on 20th August 2015 for consultation up till 4th October 2015.

    Please sign in to vote.
  • TfL Consultation: Bricklayers Arms Roundabout – Subway Closure

    Created by Shaun McDonald // 1 thread

    Bricklayers Arms Roundabout – Subway Closure
    Overview
    Transport for London (TfL) is proposing to make changes to the roundabout to improve personal safety for people crossing the junction.

    In June 2012 a pedestrian survey of the footway and subway system was carried out. The survey showed that between 50-70 crossing movements are made through each of the subway bores between 7am-7pm, with the majority of people preferring to use the crossings at ground level. A key factor in this is the design of the central island and subway network, which attracts crime and anti-social behaviour

    The main scope of the work being proposed is to block up the subways and improve the crossings at street level. Further detail is outlined below and on the attached plan:

    Decommissioning and infilling of the subway bores, ramps and stairs;

    Re-paving of the perimeter footways.

    Providing a new street level crossing facility to increase accessibility to the northeast corner (Tower Bridge Road) of the roundabout.

    Removal of the concrete wall which surrounds the roundabout.

    Improved street lighting.

    Retention of mature trees and new tree planting.

    The subway closure works are programmed to commence from mid-February.

    If you have any questions or comments about these proposals please contact us by 8 February 2013.

    https://consultations.tfl.gov.uk/streets/bricklayersarms/consult_view

    Please sign in to vote.

532 threads found for 'consultation':

No planning applications found for 'consultation'.

Back to top