  • Left turns from bidirectional North-South CSH

    Created by Bruce Lynn // 1 thread

    Problem with bidirectional paths is making left turns across the traffic. For North-South Cycle Superhighway TfL proposed a small waiting area with protective island (see illustration from Consultation document). They built one island and found cars going wrong way round it, so removed the island. So left turns waiting bays now have only white paint (see photos at http://healthyrider.weebly.com/miscellaneous.html). Very intimidating when traffic is heading towards you from the opposite motor traffic lane!
    I understand TfL is "working on a solution". But does anyone have ideas we could feed to TfL. Does anyone know of an example where an "offside" left turn has been well engineered?

    Please sign in to vote.
  • Junction of A100 Tower Bridge Road and Tanner Street

    Created by Simon Munk // 1 thread

    TfL Overview
    In partnership with the London Borough of Southwark, we have developed proposals to improve the provision for cyclists and other road users around Tower Bridge Road/Tanner Street junction, and we would like to hear your views.

    What are we proposing?
    The proposals are part of the Central London Grid – a network of cycle routes in Zone 1. The route passes along Tanner Street, Southwark Council consulted on proposals on the rest of the route in autumn 2015, including proposals for the one-way operation of Tanner Street. Our proposals aim to improve safety and create more space for cyclists, and have been coordinated with Southwark Council’s designs.
    Our proposals also include changes to traffic and bus lanes, as well as new traffic restrictions and improved pedestrian crossings.

    The enclosed consultation drawing shows the proposals for this junction. The numbered descriptions below correspond with the numbered labels on the drawing.
    1 Carriageway to be widened by 0.5 metres to improve traffic flow. There will still be sufficient width maintained on the footway.
    2 Centre lines to be altered to provide two northbound general traffic lanes further back from the junction with Druid Street
    3 New one-way westbound on Tanner Street between Tower Bridge Road and Archie Street to create space for a segregated two-way cycle track
    4 New one-way eastbound on Tanner Street between Tower Bridge Road and Pope Street to allow for contraflow cycle provision
    5 Segregated bi- directional cycle track to allow cyclists to approach and exit the junction with substantially reduced risk of conflict with motor vehicles
    6 New segregated contraflow cycle track to parallel crossing to allow for safer approach for cyclists, and to decrease potential conflict between modes of traffic. This would require the relocation of a loading bay (see 9 and 10)
    7 New parallel cycle/pedestrian crossing to connect the cycle route on Tanner Street and allow cyclists to conveniently cross Tower Bridge Road separately from pedestrians
    8 Cycle stands to be relocated to allow for widened traffic lanes on the approach to the junction, and to prevent conflict between traffic modes
    9 Loading bay relocated from Tanner Street to Tower Bridge Road to create space for the contraflow cycle track (see 6). The same operating hours will apply
    10 New position of relocated loading bay from Tanner Street (see 9)
    11 Loading bay relocated 12m south to provide enough space for traffic to merge. Operating hours will remain the same.
    12 New bus lane (Hours of operation: Mon –Sat, 7am-10am, 4pm-7pm) to make journeys faster and more reliable for bus passengers. We would create space by moving the centre line on this section of Tower Bridge Road.

    Please sign in to vote.
  • Home Zone in Furzedown

    Created by jon_events // 1 thread

    On-going petition to trial a home zone in the area indicated.

    Specific ask is:
    We, the undersigned, call on Wandsworth Council to pilot a home zone area on the east side of Mitcham Lane, from Fallsbrook Road to Blegborough Road, for a suitable period of time using temporary measures to see if the benefits from creating a permanent home zone outweigh any potential traffic disruption that may be caused.

    The Mini-Holland approach taken to filtering traffic in Waltham Forest gives an example of how other parts of London are creating safer streets.

    http://www.wandsworthlibdems.org.uk/home_zone_in_furzedown

    Please sign in to vote.
  • Let's make Mitcham Lane safe for all

    Created by jon_events // 1 thread

    On-going petition to make Mitcham Lane safe for all add your support here:
    http://www.wandsworthlibdems.org.uk/let_s_make_mitcham_lane_safe_for_all

    Petition ask:
    We, the undersigned, call on TfL and Wandsworth Council to make changes to Mitcham Lane so that cycling can be an option for everyone, not just the fit and the brave.

    Originally submitted to the council in the Autumn 2013.

    Please sign in to vote.
  • Central London Cycling Grid Borough High Street/Newcomen Street junction

    Created by Simon Munk // 1 thread

    Overview
    We are seeking your views on proposed changes to the junction of Borough High Street with Union Street and Newcomen Street. The proposals are part of the Central London Cycling Grid - a network of cycle routes in Zone 1.
    This junction forms part of the Blackfriars to Tower Bridge Road route. The London Borough of Southwark consulted on other parts of this route in October 2015 – further details can be found here:
    What are we proposing?
    Our proposals aim to improve safety for cyclists and accommodate the predicted increase in cyclists along this route. The design would provide a more direct route for eastbound cyclists by removing a long detour and allowing them to proceed along Newcomen Street. By altering the signal phasing of the junction, we would also enable cyclists on Borough High Street to turn onto the new route.
    Why are we proposing this?
    The Blackfriars to Tower Bridge Road Route will provide a safer and more pleasant journey through a section of the city that is already popular among commuters as well as recreational cyclists. Transport for London and Southwark Council have identified certain junctions and sections of the proposed route that could be modified to improve cycle accessibility as well as safety for all users of the road, including pedestrians.
    By closing a short section of Newcomen Street to motor vehicles and creating two-way access to the junction, we will remove a long detour from the cycle route. Changes to signal phasing at the junction, and modifications to existing street furniture, will create safer routes for cyclists without affecting pedestrian accessibility.
    At construction stage the junction would also be resurfaced. Proposals for this junction are:
    Union Street
    Existing contra-flow cycle lane retained for cyclists travelling westbound on Union Street. This would connect to Southwark Council’s proposals for Union Street.
    Existing advanced stop line extended to 5m with a cycle feeder lane. These extended facilities would provide cyclists with a larger waiting area in front of motor traffic, improving their visibility, and allowing them to safely move away at the traffic lights.
    Borough High Street
    Dedicated low-level cycle signals to inform cyclists of when to safely proceed across Borough High Street from Union Street and Newcomen Street.
    Pedestrian islands widened to improve pedestrian accessibility across Borough High Street.
    Cyclists permitted to turn left onto Union Street and Newcomen Street. This movement is currently banned and would remain banned for other vehicles. This allows cyclists on Borough High Street to join the route. The signal phasing would be altered to permit this movement. NOTE: All vehicles (including cyclists) would continue to be banned from turning right into Union Street or Newcomen Street.
    All-round pedestrian signal phase retained so that pedestrians can safely make all movements across the junction at the same time.
    Newcomen Street
    Section of Newcomen Street closed to motorised traffic. Bollards would be installed approximately 30m west of the junction to enforce road closure to motorised traffic except for emergency access. NOTE: Newcomen Street is a borough-owned road and this aspect of the scheme would be progressed by the London Borough of Southwark.
    Two-way cycling permitted on Newcomen Street allowing cyclists travelling eastbound to proceed directly from Union Street, and turn left from Borough High Street.
    Existing footways widened to improve pedestrian accessibility.
    We have carried out traffic modelling for this proposal. The results indicate that the proposed changes can be accommodated without undue delay to any road user.

    Please sign in to vote.
  • Vauxhall Cross public consultation

    Created by Simon Munk // 2 threads

    TfL say:
    We are proposing a number of transformational changes to Vauxhall Cross as part of our Road Modernisation Plan.
    The Road Modernisation Plan is the biggest investment in London’s roads for a generation, consisting of hundreds of projects to transform junctions, bridges, tunnels and pedestrian areas, making our roads safer and more reliable.
    Working closely with the Lambeth Council, we are aiming to return the one-way road system at Vauxhall to two-way roads and significantly improve pedestrian and cyclist provision to help create a safer and less intimidating environment for vulnerable road users. The proposed changes would also help to improve connectivity throughout the area, and create a better environment for people living, working, and travelling through Vauxhall.
    Following our initial consultation in 2014 on our high level proposals, we are now inviting your views on our detailed design proposals.

    What are we proposing?
    The changes we are proposing include:
    Removing the existing one way road system around the transport interchange (Parry Street, Wandsworth Road, Kennington Lane, South Lambeth Road) by converting these roads around Vauxhall to two way
    Providing more cycle and pedestrian crossings as well as segregated lanes and parking for cyclists
    Improving existing and providing new public spaces
    Redesigning the transport interchange, including a new central bus station

    Why are we proposing this?
    Reducing traffic dominance
    The current gyratory creates an environment heavily dominated by motor vehicles. The wide carriageway encourages high speeds, especially outside peak periods
    The gyratory can be difficult to navigate, and the one-way arrangement means that vehicles often follow indirect routes
    Lack of facilities for pedestrians and cyclists
    Large numbers of pedestrians pass through Vauxhall each day but the existing crossings do not always follow the most direct or popular routes, which can lead to pedestrians crossing roads away from the crossings
    The Vauxhall gyratory has some of the highest numbers of collisions involving injury to pedestrians and cyclists in London
    Cycle Superhighway 5 will improve conditions for cycling along Harleyford Road and Kennington Lane. However, there is limited cycle provision on the other roads surrounding Vauxhall Cross and a lack of connectivity between facilities
    Supporting the transformation of Vauxhall
    Vauxhall is the gateway to one of Europe’s largest regeneration zones, with 25,000 new jobs and 20,000 new homes coming to the Vauxhall, Nine Elms and Battersea area
    Supporting Vauxhall’s distinct local character, the proposals look to the future – preparing for the increase in the numbers of people living, working, and visiting Vauxhall and its existing and new shops, businesses and attractions

    Please sign in to vote.
  • Westminster Bridge South

    Created by Simon Munk // 1 thread

    TfL say:

    "The improvements would provide a connection between the East-West Cycle Superhighway on the north bank of the Thames and the Central London Cycling Grid on Belvedere Road and Royal Street in Lambeth, providing a joined-up cycling network for this part of London."

    "Proposed layout changes for cyclists
    Provide cyclists with dedicated road space on Westminster Bridge, Westminster Bridge Road, Lambeth Palace Road, Addington Street and York Road; cyclists would be separated from traffic by a kerb or white line
    Separate cyclists and motor vehicle movements at junctions; cyclists would have their own traffic signals which would operate at different times to those for other traffic
    Widen the pedestrian/cycle crossing by the south end of Belvedere Road and improve the connection between Belvedere Road and Westminster Bridge Road
    Convert the pedestrian crossing on Lambeth Palace Road outside the hospital to a pedestrian/cycle crossing so that cyclists can access Royal Street from Lambeth Palace Road. The crossing would be changed from ‘staggered’ (two separate crossings with an island in the middle) to ‘straight across’ (a single crossing)
    Provide bus stop bypasses at bus stops D and E on Westminster Bridge Road, bus stops B and C on Lambeth Palace Road and the tour bus stop at the east side of Westminster Bridge so that cyclists could avoid having to mix with traffic. Cyclists would continue behind the bus stops on a carriageway-level cycle track, which would feature a chicane and narrowed track to reduce speeds. Bus passengers would access the bus stop waiting area by crossing the cycle track using a marked crossing point/s
    Widen the footway on the corner of York Road and Westminster Bridge Road to slow down left turning vehicles
    Cyclists would still be able to use the northbound bus and cyclist only route from Westminster Bridge Road to York Road"

    "Cycle facilities on Westminster Bridge
    "Westminster Bridge is a grade two listed structure and a busy bus, cycling and pedestrian route. We would like to know what you think about how cycle facilities should be provided on Westminster Bridge. We are proposing two options:
    a. 2.3m wide mandatory cycle lane in both directions
    This approach would give cyclists more space to overtake one another. A painted white line would separate cycles and motor vehicles, but there would be no physical segregation. Motor vehicles would be prohibited from entering the cycle lane.
    b. 1.8m wide segrgated cycle track in both directions
    This approach would provide cyclists with physical separation from motor vehicles using a 0.5m wide traffic island, but may reduce cyclists’ opportunity to overtake one another."

    Please sign in to vote.
  • EWCS Parliament Square statutory TMO consultation

    Created by Dominic Fee // 1 thread

    Westminster City Council is undertaking a statutory consultation on the Traffic Management Orders (TMOs) needed to implement the East West Cycle Superhighway at Parliament Square. You can find a description and drawings of the proposals here:
    http://westminstertransportationservices.co.uk/tmo/tmo_details.php?tt=2&id=909&cid=1

    In Westminster Cycling Campaign we rarely respond to statutory TMO consultations because the proposals are either insignificant or, if they are significant, they've usually been subject to an earlier public consultation. It would be inappropriate for us to repeat points we've made previously, and we wouldn't be listened to.

    Nevertheless I would encourage interested people to take a look at the Parliament Square drawings to check that the earlier design has been taken forward properly into a detailed design for construction. We have had a recent example where we did respond to a statutory TMO consultation in which the connection between part of the EWCS proposals (Savoy Street) and the rest of the highway network (a left-in left-out junction on the Strand) hadn't really been thought through. If we need to submit a response regarding Parliament Square, the deadline is 21 September 2015.

    Please sign in to vote.
  • Buckingham Palace - Spur Road

    Created by Colin Wing // 1 thread

    Spur Road and the road in front of Buckingham Palace form a section of the East-West Cycle Superhighway between Constitution Hill and Birdcage Walk.

    The plans that Transport for London presented to the public for consultation in February-March 2015 failed to include any specific proposals for this section. Following successful campaigning by cyclists, TfL published proposals on 20th August 2015 for consultation up till 4th October 2015.

    Please sign in to vote.
  • Cycle Superhighway 5 in Westminster (via Vauxhall Bridge Road)

    Created by Colin Wing // 2 threads

    Vauxhall Bridge Road was originally the proposed route of Cycle Superhighway 5. After Westminster objected that it would displace traffic onto local roads, a number of other routes were investigated and put out to public consultation. Although a two-way route on Belgrave Road proved the most popular with cyclists, Westminster doubted whether it was feasible. So attention has now turned back to Vauxhall Bridge Road.

    Please sign in to vote.
  • East-West Cycle Superhighway - phase 2 consultation

    TfL are consulting on plans for the East-West cycle superhighway in Hyde Park and St James's Park. The proposals can be seen at https://consultations.tfl.gov.uk/cycling/eastwest?cid=cycle-east-west

    The LCC office has set up this thread to facilitate discussion in advance of submitting its response to the consultation. The consultation closes on 29th March.

    To ensure that your comments will be taken into account when composing LCC’s response please make sure that your registered identity on Cyclescape includes your full name and whether you are a member of LCC and any local LCC group. (You can add these details by clicking on your name at the top of the page and then the Edit Profile tab.)

    Please sign in to vote.
  • East-West Cycle Superhighway: Westminster's alternative route

    Created by Colin Wing // 1 thread

    This is Westminster's alternative route for its section of the East-West Cycle Superhighway. The following are the differences from TfL's proposal:

    * Uses Stanhope Terrace instead of Bathurst Street

    * Goes via the Mall, Trafalgar Square and Northumberland Avenue instead of Birdcage Walk, Parliament Square and Victoria Embankment.

    A plan is available at http://committees.westminster.gov.uk/documents/s9058/Appendix%207%20Northumberland%20Avenue%20Option%203.pdf or http://bit.ly/1IN4i44